Ya, its not just the dust. The basic need of toilet and washing is gone as well. So, beside the shellshock, this is pretty as good as a warzone now... The contractor did provide us a make shift toilet as shown. However, and luckily, before we used it, we tested it with water... And it was LEAKING. Hell, better water than shit and pee all over. They had place a make shift mat on the floor too, but I seriously think the damaged is already quite unrecoverable.
No comments:
Post a Comment